Please use this identifier to cite or link to this item: http://hdl.handle.net/10553/70049
DC FieldValueLanguage
dc.contributor.authorGarcía Muñoz, J. M.en_US
dc.contributor.authorTorres Santana, J.en_US
dc.contributor.authorMartínez Melgarejo, M.en_US
dc.date.accessioned2020-02-05T12:52:06Z-
dc.date.available2020-02-05T12:52:06Z-
dc.date.issued2011en_US
dc.identifier.otherScopus-
dc.identifier.urihttp://hdl.handle.net/10553/70049-
dc.description.abstractIn the island of Gran Canaria, Canary Islands, there are two Power Plants called Jinamar Power Plant and Barranco de Tirajana Power Plant, both property of Unelco Generacion, a subsidiary of Endesa Generacion. The first one is placed in the northeast of the island, near its capital, Las Palmas de Gran Canaria, and the other is in the southeast, near the most significant touristic area of the island. Both plants are interconnected by means of four transmission lines, two with a voltage of 220 kV and the other two with 66 kV. Since its commissioning in 1995, several phase to ground shortcircuits have occurred in one of the capacitive tap insulators in the 220 kV lines, in Jinamar side, without a clear cause for them, causing problems of different kind in the electrical system of Gran Canaria. From construction of tap insulators to environmental conditions, every possible factor was carefully studied and laboratory tests were made. In this paper it is described the analysis that was carried out and how a deep study of every possible cause drove to a definitive solution of the problem.en_US
dc.description.abstractEl artículo expone y analiza la problemática existente en uno de los pasatapas capacitivos, concretamente el de la fase S, de la línea de 220 kV que interconecta las dos centrales eléctricas existentes en la isla, Barranco de Tirajana y Jinámar, pasatapas instalado en esta última y que conecta la línea con la correspondiente borna del transformador elevador situado en la central. Tal problemática derivaba en periódicos cortocircuitos monofásicos desde su puesta en servicio 15 años antes del trabajo realizado. En el artículo se describe con detalle el profundo análisis que llevó a encontrar la causa última de la ocurrencia de los citados cortocircuitos y, en consecuencia, la solución definitiva al problema.en_US
dc.languageengen_US
dc.relation.ispartofRenewable Energy And Power Quality Journalen_US
dc.sourceRenewable Energy and Power Quality Journal [ISSN 2172-038X], v. 1 (9), p. 136-141en_US
dc.subject332203 Generadores de energíaen_US
dc.subject332204 Transmisión de energíaen_US
dc.subject3306 Ingeniería y tecnología eléctricasen_US
dc.subject.otherCapacitiveen_US
dc.subject.otherDirtinessen_US
dc.subject.otherField Testsen_US
dc.subject.otherShortcircuiten_US
dc.subject.otherTap Insulatoren_US
dc.titleAnalysis of behaviour of phase s capacitive tap insulator of interconnection 1, 220 kv, in jinamar power plant (Island of gran canaria, Canary Islands, Spain)en_US
dc.typeinfo:eu-repo/semantics/articleen_US
dc.typeArticleen_US
dc.identifier.doi10.24084/repqj09.266en_US
dc.identifier.scopus85073347939-
dc.contributor.authorscopusid57211293993-
dc.contributor.authorscopusid57195853188-
dc.contributor.authorscopusid56884625700-
dc.description.lastpage141-
dc.identifier.issue9-
dc.description.firstpage136-
dc.relation.volume1-
dc.investigacionIngeniería y Arquitecturaen_US
dc.type2Artículoen_US
dc.utils.revisionen_US
dc.identifier.ulpgces
item.grantfulltextopen-
item.fulltextCon texto completo-
Appears in Collections:Artículos
Thumbnail
Analys_behaviour
Adobe PDF (889,32 kB)
Show simple item record

Page view(s)

59
checked on Mar 2, 2024

Download(s)

69
checked on Mar 2, 2024

Google ScholarTM

Check

Altmetric


Share



Export metadata



Items in accedaCRIS are protected by copyright, with all rights reserved, unless otherwise indicated.