Identificador persistente para citar o vincular este elemento: http://hdl.handle.net/10553/69805
Campo DC Valoridioma
dc.contributor.authorBeltrán, Abianen_US
dc.contributor.authorGracia-León, Herberthen_US
dc.contributor.authorRodríguez-Urrego, Daniellaen_US
dc.contributor.authorRodríguez-Urrego, Leonardoen_US
dc.date.accessioned2020-02-05T12:50:15Z-
dc.date.available2020-02-05T12:50:15Z-
dc.date.issued2018en_US
dc.identifier.issn0012-7353en_US
dc.identifier.otherScopus-
dc.identifier.urihttp://hdl.handle.net/10553/69805-
dc.description.abstractThis paper propose the design, calculation and feasibility study of a reversible hydroelectric plant located in the island of Gran Canaria, with the support of a solar power plant to cover a part of the energy demand of the pumping of water from a lower reservoir to a higher one. This work is motivated in order that the island of Gran Canaria has the first hydroelectric power station in its history, and has energy storage to cover peak hours of demand between 18 and 22 hours. At the same time, it is intend to increase the installed capacity of renewable sources to the detriment of fossil fuels. Finally, this paper conclude with an economic study where a budget and its corresponding prefeasibility study are estimated, considering a construction period of 4 years and a useful life of the installation of 25 years.en_US
dc.description.abstractEste artículo propone el diseño, cálculo y estudio de factibilidad de una planta hidroeléctrica reversible ubicada en la isla de Gran Canaria, con el apoyo de una planta de energía solar para cubrir una parte de la demanda de energía del bombeo de agua desde un depósito inferior a uno superior. Este trabajo está motivado para que la isla de Gran Canaria tenga la primera central hidroeléctrica de su historia y tenga unalmacenamiento de energía para cubrir las horas pico de demanda entre 18 y 22 horas. Al mismo tiempo, tiene la intención de aumentar la capacidad instalada de fuentes renovables en detrimento de los combustibles fósiles. Finalmente, este trabajo concluye con un estudio económico donde se estiman un presupuesto y su estudio de prefactibilidad, considerando un período de construcción de 4 años y una vida útil de la instalación de 25 años.en_US
dc.languagespaen_US
dc.relation.ispartofDYNAen_US
dc.sourceDYNA (Colombia) [ISSN 0012-7353], v. 85 (206), p. 250-257en_US
dc.subject3306 Ingeniería y tecnología eléctricasen_US
dc.subject3322 Tecnología energéticaen_US
dc.subject.otherDesignen_US
dc.subject.otherHybrid Energyen_US
dc.subject.otherHydropoweren_US
dc.subject.otherIsla Gran Canariaen_US
dc.subject.otherNon-Conventional Energyen_US
dc.subject.otherPhotovoltaicen_US
dc.subject.otherSolaren_US
dc.titleDesign and calculation of a hybrid solar-hydraulic power station in Gran Canariaen_US
dc.title.alternativeDiseño y cálculo de una central híbrida solar-hidráulica en Gran Canariaen_US
dc.typeinfo:eu-repo/semantics/articleen_US
dc.typeArticleen_US
dc.identifier.doi10.15446/dyna.v85n206.70573en_US
dc.identifier.scopus85060973379-
dc.contributor.authorscopusid57205661249-
dc.contributor.authorscopusid57205658373-
dc.contributor.authorscopusid57201877704-
dc.contributor.authorscopusid57205660920-
dc.description.lastpage257-
dc.identifier.issue206-
dc.description.firstpage250-
dc.relation.volume85-
dc.investigacionIngeniería y Arquitecturaen_US
dc.type2Artículoen_US
dc.utils.revisionen_US
dc.identifier.ulpgces
dc.description.sjr0,157
dc.description.sjrqQ3
item.grantfulltextopen-
item.fulltextCon texto completo-
Colección:Artículos
miniatura
Design_calculation
Adobe PDF (594,36 kB)
Vista resumida

Citas SCOPUSTM   

1
actualizado el 21-jul-2024

Visitas

62
actualizado el 04-may-2024

Descargas

87
actualizado el 04-may-2024

Google ScholarTM

Verifica

Altmetric


Comparte



Exporta metadatos



Los elementos en ULPGC accedaCRIS están protegidos por derechos de autor con todos los derechos reservados, a menos que se indique lo contrario.