Please use this identifier to cite or link to this item: http://hdl.handle.net/10553/43088
Title: Power output of a wind turbine installed in an already existing viaduct
Authors: Hernández, Soto
Volkov, K.
Martín Mederos, A. C.
Medina Padrón, J. F. 
Feijóo Lorenzo, A. E.
Keywords: Potential Yield
Flow
Optimization
Feasibility
Buildings, et al
Issue Date: 2015
Publisher: 1364-0321
Journal: Renewable & Sustainable Energy Reviews 
Abstract: The maximum power production of a turbine installed beneath an already existing viaduct in Gran Canaria (Spain) is studied based on computational fluid dynamics (CFD) simulation. Porous discs are introduced in order to create a pressure drop, which is traduced into a power production. This method is a contrasted tool that has been largely used in a wide range of studies and gives a good approximation to the potential of a wind turbine in a specific location. Porosity of the disc varies in a wide interval to found the point where power output is maximal. CFD results aie used to analyze the effect of incidence of wind flow in a porous disc which simulates the resistance of turbine blades against the wind. Different configurations corresponding to variation of parameters and number of turbines are studied, and conclusions regarding the optimal configuration of wind farm are provided. (C) 2015 Elsevier Ltd. All rights reserved.
URI: http://hdl.handle.net/10553/43088
ISSN: 1364-0321
DOI: 10.1016/j.rser.2015.03.097
Source: Renewable and Sustainable Energy Reviews[ISSN 1364-0321],v. 48, p. 287-299
Appears in Collections:Reseña
Show full item record

SCOPUSTM   
Citations

8
checked on Apr 21, 2024

WEB OF SCIENCETM
Citations

6
checked on Feb 25, 2024

Page view(s)

53
checked on Apr 20, 2024

Google ScholarTM

Check

Altmetric


Share



Export metadata



Items in accedaCRIS are protected by copyright, with all rights reserved, unless otherwise indicated.