Identificador persistente para citar o vincular este elemento:
http://hdl.handle.net/10553/43088
Título: | Power output of a wind turbine installed in an already existing viaduct | Autores/as: | Hernández, Soto Volkov, K. Martín Mederos, A. C. Medina Padrón, J. F. Feijóo Lorenzo, A. E. |
Palabras clave: | Potential Yield Flow Optimization Feasibility Buildings, et al. |
Fecha de publicación: | 2015 | Editor/a: | 1364-0321 | Publicación seriada: | Renewable & Sustainable Energy Reviews | Resumen: | The maximum power production of a turbine installed beneath an already existing viaduct in Gran Canaria (Spain) is studied based on computational fluid dynamics (CFD) simulation. Porous discs are introduced in order to create a pressure drop, which is traduced into a power production. This method is a contrasted tool that has been largely used in a wide range of studies and gives a good approximation to the potential of a wind turbine in a specific location. Porosity of the disc varies in a wide interval to found the point where power output is maximal. CFD results aie used to analyze the effect of incidence of wind flow in a porous disc which simulates the resistance of turbine blades against the wind. Different configurations corresponding to variation of parameters and number of turbines are studied, and conclusions regarding the optimal configuration of wind farm are provided. (C) 2015 Elsevier Ltd. All rights reserved. | URI: | http://hdl.handle.net/10553/43088 | ISSN: | 1364-0321 | DOI: | 10.1016/j.rser.2015.03.097 | Fuente: | Renewable and Sustainable Energy Reviews[ISSN 1364-0321],v. 48, p. 287-299 |
Colección: | Reseña |
Los elementos en ULPGC accedaCRIS están protegidos por derechos de autor con todos los derechos reservados, a menos que se indique lo contrario.