Please use this identifier to cite or link to this item:
http://hdl.handle.net/10553/20407
Title: | Critical clearing time and wind power in small isolated power systems considering inertia emulation | Authors: | Medina Domínguez, Elías Jesús Medina-Padrón, José F. |
UNESCO Clasification: | 332202 Generación de energía 220709 Conversión de energía |
Keywords: | Full converter wind turbine Inertia emulation Isolated power system Transient stability Wind power |
Issue Date: | 2015 | Journal: | Energies (Basel) | Abstract: | In this paper, wind power and CCT are studied in a small isolated power system. Two types of wind turbines are considered: a squirrel cage induction generator (SCIG) and a full converter. The study focuses on the small, isolated Lanzarote-Fuerteventura power system, which is expected to be in operation by 2020. | URI: | http://hdl.handle.net/10553/20407 | ISSN: | 1996-1073 | DOI: | 10.3390/en81112334 | Source: | Energies (Basel) [ISSN 1996-1073], v. 8 (11), p. 12669-12684, (Enero 2015) | Rights: | by |
Appears in Collections: | Artículos |
Items in accedaCRIS are protected by copyright, with all rights reserved, unless otherwise indicated.